2019
This required a fully designed protection scaffold to three elevations, with methodical sequential demolition by high reach, periodic reduction of the scaffolding as works progressed. Finally removing the foundations to a depth of 2m.
This project was without incidents and during the works we gained the respect of the local businesses, residents and general public.