Demolition in the heart of the town centre of Huddersfield which was the largest demolition project that Kirklees Council had ever awarded.

Works included asbestos removal and demolition of two 11 storey high-rise blocks of flats, a large sports centre, multi-storey car park and numerous various construction buildings.

Southgate Huddersfield

Service

Demolition

Client

Kirklees Council

Completion Date

August 2016

Job Duration

30 Weeks

Contract Value

£1,400,000

2016

Extensive considerations and control measures were implemented has there was the busiest highway within 10m of one of the high-rise blocks, which could not be closed at any point. This required designed scaffold pedestrian walkways, debris fans and roadside protection. A live substation adjoined one of the blocks which required substantial scaffold protection. Special care had to be taken not to disturb critical fibre optic cabling which run under the site.

98% of all waste arisings were recycled and avoided landfill.

The project was delivered 4 weeks early, under the £1.4 million pound budget, and without any incidents.