2015
All surface buildings were removed with over 15,000 tonnes of steel work being removed and tens of thousands of brick/concrete being recycled and removed from site for use back into the construction industry.
All surface buildings were removed with over 15,000 tonnes of steel work being removed and tens of thousands of brick/concrete being recycled and removed from site for use back into the construction industry.